Reach out on facebook
Follow us on instagram
Get the latest updates
Discover Our TikTok
SriLankan Airlines at VIA Terminal 1
SriLankan Airlines at VIA Terminal 1
Rasmale’ Site A Reclamation Hits 17% Milestone
President Muizzu Maintains Majority Support: Poll
Muizzu Maintains Majority Support: Poll

Rasmale’ Site A Reclamation Hits 17% Milestone

Rasmale’ Reclamation Reaches 17%
Rasmale’ Reclamation Reaches 17%

Land reclamation at Rasmale’ Site A has reached 17 percent, with 23 hectares reclaimed out of the planned 137.5 hectares.

Maldives Airports Company Limited (MACL) said works are being carried out using Cristóbal Colón, one of the world’s two largest trailing suction hopper dredgers. The vessel has a capacity of 46,000 cubic metres and is operated by Jan De Nul.

MACL began reclamation works at Rasmale’ Site A on 1 December 2025.

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *